Cabinet Approves Second Container Terminal at Kamarajar Port

On November 25, 2026, the Cabinet Committee on Economic Affairs, chaired by Prime Minister Narendra Modi, approved a second container terminal at Kamarajar Port Limited in Tamil Nadu. The project has an estimated cost of ₹4,288.26 crore, including GST.

|||5 min Mins. to read
Cabinet Approves Second Container Terminal at Kamarajar Port

On November 25, 2026, the Cabinet Committee on Economic Affairs, chaired by Prime Minister Narendra Modi, approved a second container terminal at Kamarajar Port Limited in Tamil Nadu. The project has an estimated cost of ₹4,288.26 crore, including GST.

Capacity and project design

The terminal will be developed under a Public Private Partnership on a Design, Build, Finance, Operate and Transfer basis, with the selected concessionaire arranging the investment. Its planned annual capacity is 2.0 million Twenty-foot Equivalent Units (TEUs), to be added in two phases: Phase I will cost ₹2,429.32 crore and provide 1.1 million TEUs; Phase II will cost ₹1,858.94 crore and add 0.9 million TEUs. The 900-metre terminal will have a design draft of 18 metres and be capable of handling vessels up to 24,346 TEUs and 400 metres long. The planned concession period is 40 years. Kamarajar Port Limited will bear the estimated ₹450-crore dredging cost.

Tender and construction schedule

The Request for Qualification-cum-Request for Proposal was issued on August 20, 2026, with bids scheduled to open on November 11, 2026. Phase I is expected to be completed within 24 months of the concession award, with commercial operations beginning in the 25th month. Phase II construction is scheduled for months 25 to 48, with full commercial operations starting in the 49th month.

Important Facts for Exams

  • Corporate status: Kamarajar Port is India’s only corporatised major port and is registered as a company, an unusual institutional form among major ports.
  • Landlord-port model: Kamarajar Port outsources operational and maintenance services, while developing new terminals with private-sector participation.
  • TEU measure: A TEU expresses cargo capacity by reference to the volume of a 20-foot intermodal container and is used for both ships and ports.

Recent & Most Viewed

Teaching Pariksha app preview

Download Our App

Use the Teaching Pariksha app for personalised quizzes, smart revision nudges and doubt solving.

4.6 ★Play Store Rating
5L+Practice Questions
14+Years Experience
Download on the App StoreGet it on Google Play