Polar Satellite Launch Vehicle (PSLV-N1)

ISRO Chairman V. Narayanan announced that India’s first industry-manufactured Polar Satellite Launch Vehicle (PSLV-N1) is targeting its maiden launch in the first quarter of 2027.

|||5 min Mins. to read
Polar Satellite Launch Vehicle (PSLV-N1)
Prelims

Polar Satellite Launch Vehicle (PSLV-N1)

Source: TOI

Subject: Science and technology

Context: ISRO Chairman V. Narayanan announced that India’s first industry-manufactured Polar Satellite Launch Vehicle (PSLV-N1) is targeting its maiden launch in the first quarter of 2027.

Polar Satellite Launch Vehicle (PSLV-N1)
Polar Satellite Launch Vehicle (PSLV-N1)

About Polar Satellite Launch Vehicle (PSLV-N1):

What it is?

  • India’s first fully industry-built Polar Satellite Launch Vehicle (PSLV-XL variant)—designated PSLV-N1—marking the transition of ISRO’s proven four-stage medium-lift workhorse rocket from government-led assembly to end-to-end domestic private-sector manufacturing.

Organisation: Manufactured by a consortium led by Hindustan Aeronautics Limited (HAL) and Larsen & Toubro (L&T) under a September 2022 contract (₹860 crore for five PSLV-XL rockets) awarded by NewSpace India Limited (NSIL), ISRO’s commercial arm.

Aim: To increase India’s satellite launch frequency by transferring launch vehicle manufacturing to domestic industries, enabling ISRO to focus on advanced research, technological innovation and deep-space missions.

Key Features of PSLV-N1:

  • End-to-End Industry Manufacturing: Unlike earlier ISRO-integrated PSLVs, the HAL–L&T consortium independently handles component procurement, vehicle integration and testing, marking a major shift towards industry-led manufacturing.
  • Four-Stage Solid–Liquid Propulsion: Features alternating solid and liquid propulsion stages with six extended strap-on boosters, carrying up to 1,750 kg to Sun-Synchronous Polar Orbit and 1,425 kg to Geosynchronous Transfer Orbit.
  • Post-Failure Component Upgrades: Incorporates revised vendor components and third-stage quality improvements recommended by ISRO’s Failure Assessment Committee following the PSLV-C61 and PSLV-C62 mission setbacks.
  • Multi-Orbit Versatility: Inherits PSLV’s proven capabilities demonstrated through Chandrayaan-1, Mangalyaan and Aditya-L1 missions, alongside the successful launch of 434 foreign satellites from 34 countries.
  • Earth Observation and Commercial Payloads: Scheduled to deploy the Earth Observation Satellite (EOS-10) alongside commercial payloads, expanding India’s operational satellite fleet and strengthening commercial launch capabilities.

Significance:

  • Advances the 2020 space reforms by transforming Indian industries from component suppliers into launch vehicle manufacturers.
  • Boosts launch frequency and global market share, supporting India’s ambition to build a $40–45 billion space economy within a decade.

Recent & Most Viewed

Teaching Pariksha app preview

Download Our App

Use the Teaching Pariksha app for personalised quizzes, smart revision nudges and doubt solving.

4.6 ★Play Store Rating
5L+Practice Questions
14+Years Experience
Download on the App StoreGet it on Google Play