The Demwe Lower Hydroelectric Project

Former civil servants under the Constitutional Conduct Group (CCG) urged authorities to cancel the 1,750-MW Demwe Lower Hydroelectric Project in Arunachal Pradesh.

|||5 min Mins. to read
The Demwe Lower Hydroelectric Project
Mapping

The Demwe Lower Hydroelectric Project

Source: NIE

Subject: Mapping

Context: Former civil servants under the Constitutional Conduct Group (CCG) urged authorities to cancel the 1,750-MW Demwe Lower Hydroelectric Project in Arunachal Pradesh.

The Demwe Lower Hydroelectric Project
The Demwe Lower Hydroelectric Project

About The Demwe Lower Hydroelectric Project:

What it is?

  • A proposed 1,750-MW run-of-the-river peaking hydropower project featuring a large concrete gravity dam, currently pursued by private developer Greenko after acquiring the stalled project.

Located in: Situated in Lohit district, Arunachal Pradesh, immediately downstream of the sacred Parashuram Kund pilgrimage site and within 50 metres of the Kamlang Tiger Reserve boundary.

River Associated: Constructed across the Lohit River (a major eastern tributary of the Brahmaputra River originating in eastern Tibet).

History:

  • Initial Clearances (2010–2012): Originally awarded to Athena Energy Ventures, receiving initial environmental clearance in 2010 and forest/wildlife approvals by 2012 despite dissent from independent NBWL members.
  • NGT Suspension & Revival (2017–2026): Suspended by the National Green Tribunal (NGT) in October 2017 over procedural irregularities in wildlife clearance; later acquired by Greenko and brought back before the SC-NBWL for fresh clearance review in July 2026.

Key Features of the Dam & Project:

  • Large Concrete Gravity Structure: Envisages a massive concrete gravity dam designed with a reservoir-backed peaking-power operational model.
  • Extensive Forest Diversion & Submergence: Requires diverting 1,416 hectares (ha) of forest land, submerging ~1,590 ha, and felling approximately 43,000 trees.
  • Proximity to Protected Areas: The submergence zone extends into the Eco-Sensitive Zone of Kamlang Tiger Reserve (within 50 metres of its boundary) and affects downstream habitats including Dibru-Saikhowa National Park in Assam.
  • Sharp Lean-Season Flow Fluctuations: Designed to hold back river water for nearly 20 hours daily before releasing sudden peaking surges of up to 1,729 cubic metres per second.
  • Threat to Endangered Biodiversity: Impacts habitats of the critically endangered White-Bellied Heron, Bengal Florican, Gangetic River Dolphin, Mishmi Takin, Red Panda, Eastern Hoolock Gibbon, and four big cat species.

Significance:

  • Highlights the need to balance hydropower development in the fragile Eastern Himalayas with biodiversity safeguards and environmental regulations.
  • Raises concerns over Mishmi ancestral lands, forest-based livelihoods and the sacred Parashuram Kund.

Recent & Most Viewed

Teaching Pariksha app preview

Download Our App

Use the Teaching Pariksha app for personalised quizzes, smart revision nudges and doubt solving.

4.6 ★Play Store Rating
5L+Practice Questions
14+Years Experience
Download on the App StoreGet it on Google Play